Resource Forecast
Hiring Frozen
2026 baseline to 2027 projection
Live
No Action Needed
Current team can handle the 2027 workload within the 85% utilization target. No action required.
Hour Gap (2027)
0
hrs/yr short
Utilization (if no hire)
67.7%
Target: 85%
Total Materials (2027)
3107
+900 from launches
Headcount (Frozen)
8
locked at current team
Material Complexity Breakdown (2026)
High (6h)
Medium (3h)
Low (1h)
735 high (4410 hrs)
736 medium (2208 hrs)
736 low (736 hrs)
Blended rate: 3.33 hrs/material |
Total demand: 7354 hrs/yr |
Available capacity: 15288 hrs/yr
Recommended Actions (ranked by impact)
No capacity gap to solve. The current team covers 2027 demand.
Coordinator Workload
Add Coordinator
2027 Projection Settings
Recent Updates
Auto-refreshing
No coordinator updates yet.
Share /forecast/submit with your coordinators to start collecting data.